
65 Harristown
Road Glen Rock, NJ 07452 P:
201.652.0555 F: 201.652.0002 |
Holland Tunnel Rotary Ericsson Place, New York,
NY
|
Owner: |
Port
Authority of NY & NJ |
|
Size: |
250,000
square feet |
|
Cost: |
$12
million |
Members
of Studio 5 Partnership designed the landscape as part of The Port
Authority of NY & NJ team to beautify and reconfigure the Holland
Tunnel Rotary in New York.
Our responsibilities included selecting
the planting materials and designing pedestrian areas including paving,
benches, and fences. In addition, members of Studio 5 were responsible for
the design and details of the irrigation system.
A presentation
with plant materials and landscape Architectural items were prepared for a
community meeting. Our staff worked closely with the Port Authority
engineers to make this important portal to the city an outstanding design
experience. We also were responsible for the preparation of cost estimates
and specifications. |
 |